GAN Yong, QI Huan, XIAO Henghui. Priority Algorithm of Ship Scheduler in Navigation Co-scheduling System for the Three Gorges-Gezhouba Dam[J]. Journal of Transport Information and Safety, 2006, 24(6): 128-131,135. doi: 10.3963/j.issn.1674-4861.2006.06.036
Citation:
|
GAN Yong, QI Huan, XIAO Henghui. Priority Algorithm of Ship Scheduler in Navigation Co-scheduling System for the Three Gorges-Gezhouba Dam[J]. Journal of Transport Information and Safety, 2006, 24(6): 128-131,135. doi: 10.3963/j.issn.1674-4861.2006.06.036
|
GAN Yong, QI Huan, XIAO Henghui. Priority Algorithm of Ship Scheduler in Navigation Co-scheduling System for the Three Gorges-Gezhouba Dam[J]. Journal of Transport Information and Safety, 2006, 24(6): 128-131,135. doi: 10.3963/j.issn.1674-4861.2006.06.036
Citation:
|
GAN Yong, QI Huan, XIAO Henghui. Priority Algorithm of Ship Scheduler in Navigation Co-scheduling System for the Three Gorges-Gezhouba Dam[J]. Journal of Transport Information and Safety, 2006, 24(6): 128-131,135. doi: 10.3963/j.issn.1674-4861.2006.06.036
|
Priority Algorithm of Ship Scheduler in Navigation Co-scheduling System for the Three Gorges-Gezhouba Dam