2012 No. 2
Display Method:
A New Technology of PC Continuous Girder Bridge for Movable Mould Block Casting by Hole Construction
2012, 30(2): 106-109.
doi: 10.3963/j.ISSN1674-4861.2012.02.026
Abstract: